Ohio Cryogenic Gas Facility Plans Improvements

(Image courtesy of BCCK)

BCCK Holding Company (BCCK), an engineering, procurement, fabrication, and field construction services, has been awarded a contract to improve overall project economics at a cryogenic gas facility in the Marcellus-Utica Basin.

Drawing upon its experience with cryogenic gas processing and natural gas liquids extraction, BCCK developed a modification that will improve on the existing cryogenic plant design and equipment, increasing propane recovery and associated revenue, the company said.

The project, located in southeastern Ohio, will utilize a skidded BCCK design, which will be available to enhance propane recoveries at other 200 MMscf/d (5.6 x 106 m3/d) gas subcooled process (GSP) facilities operating throughout the US.

“BCCK is further expanding our portfolio in natural gas cryogenic processing with the addition of this patent-pending technology that enhances recoveries at existing GSP cryogenic facilities,” said Brian Petko, senior vice president of engineering at BCCK. “We are excited to be working with one of the premier midstream groups in the Marcellus-Utica Basin.”

The full project will draw upon all BCCK’s companies: BCCK Engineering for detailed engineering and design; NG Resources for fabrication; and NGF Construction for field installation.

Headquartered in Midland, Texas, USA, BCCK specializes in engineering, procurement, and construction projects including concept, engineering, design, fabrication, manufacturing, and complete construction services.

 

 

Previous articleBurckhardt Technology For India Refinery Expansion Project
Next articleKP Engineering Names New CEO